CONNECT
Checking session…

EVOEGY EXPERT ACCESS

Immediate engineering expertise.When decisions can't wait.

Rapid access to independent, principal-level engineering expertise for time-critical project and operational challenges through agile, fixed-fee microprojects. One agreed outcome. No existing Evoegy relationship required for eligible clients.

Start an enquiry online at any time. We confirm scope and availability before engagement.

A SIMPLER WAY TO ENGAGE

Define. Engage. Pay. Resolve.

Start with an urgent question, not a catalogue of services. Eligible new and existing clients can initiate a microproject online without negotiating a conventional bespoke appointment, subject to their own purchasing requirements.

  1. 01

    Define

    Describe the immediate issue and the decision you need to make.

  2. 02

    Engage

    Agree the outcome, fixed fee, capacity and delivery timeframe.

  3. 03

    Pay

    Accept standard terms and pay by credit card or bank transfer, where available and authorised.

  4. 04

    Resolve

    Receive rapid engineering support. Act on the findings, continue or commission the next question.

Work begins only after scope and terms are accepted, full payment is verified and Evoegy authorises commencement. Delivery requires accepted supporting information and confirmed capacity. This is not an emergency response service.

Two focused engagements

Quick Expert Advice

$7,500AUD ex taxes

72-hour target

Focused engineering assessment and a concise decision brief.

Target: within 72 hours of accepted complete information, subject to scope, capacity and authorised commencement.

Get expert help

Technical Memorandum

$15,000AUD ex taxes

Agreed timeframe

Quality-assured technical assessment with findings, conclusions and recommendations.

Delivery timeframe agreed during scoping.

Get expert help

WHY TIME MATTERS

A technical delay is rarely an isolated delay.

An unresolved technical issue can hold up a predecessor activity and delay dependent contractors, crane and equipment availability, weather-dependent work and scheduled commissioning or Renewable Energy Zone (REZ) integration testing. A short technical hold can have consequences far beyond its duration.

Three days of technical hold. Four weeks of potential programme impact.

Illustrative schedule: component replacement works on the critical path, with insufficient float and a booked REZ integration testing window.

Baseline and delayed critical-path schedulesBaseline component works finish day 5, reassembly day 8, pre-testing day 11, REZ testing begins day 12 and completes day 14. A three-day technical hold during component works moves completion to day 8, reassembly to day 11 and pre-testing to day 14, missing the day 12 test slot. A hypothetical replacement test slot starts day 40, 28 days later, with completion day 42.071421283542BASELINEWITH TECHNICAL HOLDComponent worksReassemblyPre-testingREZ testingComponent worksReassemblyPre-testingREZ testing3-day holdAwaiting next available test windowBooked slotNext slotElapsed calendar days
Baseline worksDelayed worksTechnical hold / missed window

A three-day hold within the predecessor activity moves its dependent successors and can cause a missed test slot. Here the next slot is assumed to be 28 days after the original booking, not a forecast or standard rebooking interval.

In operation, an unresolved issue can prolong an outage, expose equipment to secondary damage or lead to lost generation. Management needs a timely, substantiated engineering position to decide what can safely proceed, what needs to change and what needs further investigation.

SMALL ENGAGEMENTS. SIGNIFICANT COMMERCIAL IMPACT.

Four Pillars of Commercial Value

Engineering uncertainty can be expensive. So can an inadequately informed decision made under programme pressure. Timely, substantiated engineering judgement supports management decisions across the asset lifecycle.

01

Protect the Programme

Address technical bottlenecks, dependent contractor activities, critical-path slippage and the risk of missing weather or commissioning windows.

$315,000

Seven days of illustrative committed site expenditure at $45,000/day.

02

Protect Asset Integrity

Challenge inadequate QA/QC, workmanship and technical concessions before latent defects, rework or reduced reliability compromise asset life.

25 years

Illustrative operating life influenced by decisions made during construction.

03

Protect Revenue

Support early generation, timely commercial operation, availability, performance and informed return-to-service decisions.

$75k–$105k

Illustrative 30-day generation revenue loss for one turbine.

04

Protect Commercial Interests

Support defensible technical decisions, warranty positions, investment decisions and proportionate remediation.

Millions

Potential exposure through rework, unnecessary replacement and disputes.

THE COST OF WAITING

What does each day of technical delay cost?

Consider a component replacement campaign where an unresolved issue holds up reassembly and dependent contractors while site resources remain committed. At an illustrative A$45,000 per day, the cost exposure accumulates even while the project awaits technical direction.

Cumulative site-cost exposure during a technical hold

Common zero-based linear scale · AUD

1 day of site delay$45,000
3 days of site delay$135,000
7 days of site delay$315,000
14 days of site delay$630,000
21 days of site delay$945,000

Assumes constant committed site costs at A$45,000/day. These are illustrative costs, not verified losses or savings. Actual incremental and avoidable costs depend on the circumstances; downstream impacts must be assessed separately.

Against that exposure, a focused engineering decision brief is A$7,500 or a Technical Memorandum is A$15,000, excluding applicable taxes. The value lies in bringing forward defensible management decisions, not in guaranteeing that the entire exposure can be avoided.

Explore operational and lifecycle exposure examples

Single-turbine downtime

Common zero-based linear scale · AUD

Quick Expert Advice$7,500
Technical Memorandum$15,000
Seven days of unavailable generation$21,000
30 days of unavailable generation$90,000

Illustrative A$3,000/day of lost revenue (range A$2,500–A$3,500). Actual generation, wind, curtailment and commercial terms determine revenue exposure.

Long-term asset performance

Common zero-based linear scale · AUD

Quick Expert Advice$7,500
Technical Memorandum$15,000
Persistent 0.1% relative generation loss$1,226,400
Persistent 0.5% relative generation loss$6,132,000
Persistent 1% relative generation loss$12,264,000

200 MW, 35% capacity factor, A$80/MWh, 25 years; constant, undiscounted revenue. Not a forecast or guaranteed recoverable loss.

These scenarios are illustrative, not industry-wide rates or a promise of acceleration. Independent assessment may recommend stopping work where safety or technical integrity requires it.

Need engineering input now?

No need to use the calculator before requesting help.

Get expert help
Calculate your own commercial exposure (optional)

YOUR PROJECT. YOUR ASSUMPTIONS.

Commercial Exposure Calculator

Explore the scale of potential exposure against a fixed engagement fee. Inputs remain in this calculator's local page state; they are not submitted or stored by it.

Illustrative commercial exposure$630,000

Exposure versus engagement fee

Common zero-based linear scale · AUD

Engagement fee$7,500
Potential exposure$630,000
Exposure / fee
84×
Equivalent break-even delay avoided
4 hours
Hypothetical net benefit (7 days avoided)
$307,500

Only include incremental costs attributable to the delay; the $45,000 default is an illustrative assumption, not a claim that all committed site costs are avoidable. Allow for programme float, contractual allocation and actual standby charges. Break-even hours assume linear daily cost accrual. Actual benefits depend on the evidence, engineering outcome and implementation.

Illustrative only; excludes applicable taxes. This calculator is not engineering advice, a forecast, a guarantee of savings or authority to proceed with unsafe work.

Get expert help

ENGINEERING CONTINUITY

Engineering challenges don’t follow the working week.

Project and operational exposure continues across weekends and holiday periods. Access to timely engineering expertise can bring forward substantiated management decisions, preserve programme flexibility and reduce the commercial exposure associated with waiting.

Engineering expertise beyond the working week

Illustrative 14-day calendar showing how access to engineering expertise across weekends and public holidays can maintain project momentum while commercial exposure continues.

Week 1Week 2
PatternMTWTFSSMTWTFSSDays
Site exposure14/14
Five-day working weekPH9/14
Expert Access14/14
Potential site exposureFive-day working weekPossible public holidayExpert Access availabilityAvailability not shown

Engage sooner. Commence sooner. Decide sooner.

Illustrative calendar of engagement accessibility, not a guaranteed staffing schedule. Engineering support across weekends and public holidays is subject to agreed scope, confirmed capacity and authorised commencement.

Rapid engagement

Streamlined scoping, fixed fees, direct expertise and controlled information exchange. No open-ended commitment.

Agile execution

Stop, continue or pivot at each completed outcome. Separately agree any additional or parallel work.

Seven-day engineering access

Initiate engagements across weekends, public holidays and critical holiday periods. Earlier commencement of engineering assessment can maintain project momentum and bring forward informed decisions.

Commencement requires accepted scope and terms, verified full payment and Evoegy approval. Turnaround depends on complete information, agreed scope and capacity; not an emergency response service.

WHAT IT IS FOR

Fast answers to defined engineering problems.

01

Resolve a site problem

Independent guidance on faults, damage, defects and practical next actions.

02

Support a technical decision

Challenge an assumption, review a proposed response or clarify an emerging engineering risk.

03

Bridge to a larger appointment

Address the urgent question while a wider project agreement is arranged.

THE MICROPROJECT LIFECYCLE

Five clear stages behind a simple engagement.

Follow your agreed engineering outcome from guided scope definition to quality-assured delivery and formal acceptance. Independent, sequential or concurrent microprojects each retain their own agreed scope and approvals.

  1. Define

    Shape the problem and scope through guided questions and scoping RFIs. Confirm the required decision, SMART outcome and boundaries.

  2. Plan

    Evoegy finalises the delivery approach, required evidence, acceptance criteria, timeframe and fixed fee against the agreed SMART outcome.

  3. Initiate

    Accept the scope and Evoegy Standard Terms. Pay the official Xero invoice; Evoegy verifies full payment and separately authorises commencement.

  4. Execute

    Use controlled Box access to exchange evidence, resolve technical RFIs, validate information, analyse the problem, develop findings and recommendations, and complete technical quality assurance.

  5. Deliver & Close

    Receive the controlled technical deliverable, review it against the agreed SMART outcome and acceptance criteria, and resolve any closeout queries within scope.

Before work starts

We confirm commencement once the agreement is signed, full invoice payment is verified and Evoegy authorises the start. Payment does not grant access automatically.

YOUR MICROPROJECT, IN VIEW

Know where you stand. Know what happens next.

Not just another consultancy inbox. Each authorised project has a defined stage, documented milestones, clear action owners, independent status indicators and a traceable record of decisions.

EXAMPLE CLIENT COMMAND CENTRE

Turbine component assessment

EA-DEMO-001 Independently scoped microproject

ILLUSTRATIVE ONLY
01 — DefineNEXT ACTION: CLIENT / EVOEGY

Define the scope

Use structured questions and scoping RFIs to clarify the technical problem, decision, boundaries and measurable outcome.

Lifecycle gates

0 / 8 confirmed
  1. Stage 01 · Problem and scope defined — Next checkpoint
  2. Stage 02 · Scope and delivery plan finalised — Pending
  3. Stage 03 · Agreement and Standard Terms accepted — Pending
  4. Stage 03 · Full payment verified — Pending
  5. Stage 03 · Commencement authorised — Pending
  6. Stage 04 · Supporting information accepted — Pending
  7. Stage 04 · Technical deliverable approved — Pending
  8. Stage 05 · Deliverable issued, SMART acceptance and formal closure — Pending

Activity history

Guided problem definition startedRecorded event 1
Scoping RFI raisedRecorded event 2
Illustrative journey: no real client data or live payment controls.One microproject · One reference · Full audit trail

Explore the five example stages above to see how the client experience changes. Actual access is restricted to approved client contacts and individually authorised projects.

READY WHEN THE QUESTION CAN'T WAIT

Start now. We'll confirm the right scope.

A larger investigation or ongoing site support remains a separate Evoegy Consulting engagement.

Get expert help